How to Obtain a Temporary LESCO Electricity Connection
Temporary electricity connections are essential for short-term needs, such as events, construction projects, or industrial purposes. This guide outlines the process to acquire a temporary LESCO connection, which remains valid for six months. Extensions, if required, can be requested by submitting a written application to WAPDA along with a demand notice fee.
Applying for a Residential Temporary LESCO Connection
For residential purposes, such as construction of a new house, follow these steps to apply online for a temporary LESCO connection:
Step-by-Step Application Process
- Access the Application Form
- Visit LESCO’s official temporary connection application page and click “Apply Here.”
- Provide Details
- Select “LESCO” as the electricity provider.
- Identify your respective subdivision (e.g., Lahore Cantt).
- Select the applicable category type (e.g., up to 15KW).
- Enter a neighbour’s meter reference number.
- Enter Personal Information
- Fill in your name, CNIC details, and contact information.
- Indicate the total number of meters already registered under your name.
- Upload Required Documents
- Property ownership document (copy).
- Attested CNIC copies of the applicant and a witness.
- Copy of the neighbour’s electricity bill.
- Wiring contractor’s test report.
After Online Submission
- Print your application and attach all uploaded documents.
- Submit the completed file at your relevant LESCO subdivision office.
- LESCO will verify your application and conduct an on-site survey.
- If approved, a demand notice will be issued. Pay the associated fee at the designated bank, attaching your test report.
Track your application status on LESCO’s official website.
Applying for a Temporary Industrial LESCO Connection
For industrial purposes, applications for temporary connections are facilitated by the Punjab Industrial Estate Development and Management Company (PIEDMC). Follow these steps:
Application Process
- Download the Application Form
- Obtain the industrial connection form from PIEDMC’s official website.
- Complete the Form
- Fill in and sign the form. Include a cover letter and the required documents.
- Required documents include:
- CNIC copies (for both owner and witness).
- Allotment and possession letter copies.
- Application Submission
- Submit the completed form and documents to the Electrical Department at PIEDMC.
Once the site inspection is conducted and approved, a demand notice will be issued. After payment of the related charges, the temporary industrial connection will be arranged.